Ivins City

Thursday, May 17th

Last update:01:00:00 PM GMT

Headlines:
You are here: Public Works

Public Works

NOTICE INVITING BIDS - 2012 STREET IMPROVEMENTS

ROAD3Separate sealed bid proposals for the construction of the Ivins 2012 Street Improvements, Contract No. 12-02 as specified by Bidding Documents may be mailed or hand carried to Ivins City Hall, 55 North Main Street, Ivins, Utah 84738. Proposals must be received by the date of the Bid opening, Thursday, May 31, 2012 at 3:00 p.m., at which time they will be publicly opened and read aloud.

Beginning Thursday, May 17, 2012, copies of the Bidding Documents, Specifications, and Drawings may be obtained at Ivins City Hall for a nonrefundable cost of $25 per set. Electronic copies of bidding documents, specifications and drawings will also be available on CD for $10.

 The Site of the Work is located at multiple locations throughout the city including Center Street, Snow Canyon Parkway, 400 East, 250 East (Sunset Lane), 675 South, Lee’s Circle, and Kayenta Parkway. The Work consists of concrete repair, miscellaneous utility installation, asphalt pulverization and removal, grading and earthwork, curb and gutter, road base, and asphalt installation to improve an aggregated total of 2.2 miles of streets.

THERE WILL BE A PRE-BID MEETING AT THE IVINS CITY HALL AT 55 NORTH MAIN, IVINS UTAH, AT 2:00 P.M. ON WEDNESDAY, MAY 23, 2012.

 

Road Construction Ahead

road-open-3002The Snow Canyon Drive access north off Center Street is now OPEN and will no longer be detoured through the nearby neighborhoods.

As construction continues, please use caution while traveling through the area and obey all construction and speed limit signs.

Water Conservation

For Water Conservation Tips click HERE

The following is a Water Conservation Plan for the City of Ivins.

Water Conservation Plan Click HERE

Roundabouts

2008-08_Transportation_Open_House_Announcement_1Many communities in the United States such as Ivins are beginning to embrace the concept of “roundabouts.”  A roundabout is composed of a circular, raised, center island with deflecting islands on the intersecting streets to direct traffic movement around the circle.  Traffic circulates in a counter-clockwise direction making right turns onto the intersecting streets. There are no traffic signals; rather, entering traffic yields to vehicles already in the roundabout. 

 

Read more...

Ivins City Storm Water Management Plan

The Ivins City Storm Water Management Program as presented in this document is intended to indicate to the public and other affected stakeholders the manner in which Ivins City plans to comply with the storm water protection provisions of the Clean Water Act as enacted by the federal government in accordance with our UPDES (Utah Pollutant Discharge Elimination System) storm water discharge permit No. UTR090049.

You may click on the links below to view the document and/or the appendices.

Read more...

Hazardous Materials Disposal

Information for Disposal of Hazardous Materials

Washington County Solid Waste

The mission of Washington County Solid Waste (WCSW) is to manage the solid waste for Washington County residents and commercial entities in a manner that is environmentally sound, cost effective, socially responsible, and safe.  WCSW continually works to build relationships with the business community, independent haulers, municipalities, contractors, regulatory authorities, and the general public.  Success in these endeavors is accomplished through operations of the sanitary landfill, recycling sites, household electronics and household hazardous waste collection programs, composting program, paint exchange program, and tire recycling program.  The knowledge and proper use of these services combined with our public outreach and education helps maintain the quality of life in Washington County now and in the future. 

For more information including Household Hazardous Waste Collection Days click visit the Washington County Solid Waste Web Site by clicking HERE

Read more...

Dumpster Dates

2012 Dumpster DatesDumpsters

Saturday January 7, 2012

Saturday February 11, 2012

Saturday March 17, 2012

Saturday April 7, 2012

Saturday April 21, 2012

Saturday May 19, 2012

Saturday June 16, 2012

Saturday July 14, 2012

Saturday August 18, 2012

Saturday September 8, 2012

Saturday September 22, 2012

Saturday October 13, 2012

Saturday November 17, 2012

Saturday December 15, 2012

**Dumpsters are located just north of the Cemetery and East of the Public Works yard.  Dumpster Day is held one Saturday a month with the exception of Spring and Fall Clean up months when there are two.  The dumpsters are available that day on a first come first serve basis and close once full or at 3pm - whichever occurs first. 

Ivins Transportation Master Plan

Please click HERE for the most current version in it's entirety of Ivins City's Transporation Master Plan. The file is large and may take a few moments to open.

The following links are for sections of the master plan that are most commonly viewed...

Figure 8: Proposed Bike Lanes and Trails

Figure 9: Functional CLassification and Cross Section

Cross Sections 1-12

Water Quality Report

The following report is designed to provide you with information regarding the quality of water that Ivins City provides.  Our goal is to provide a safe and dependable supply of drinking water to our residents. 

Ivins City not only holds vested rights, but we purchase additonal water from St. George, Santa Clara, and the Washington County Water Conservancy.  Sources of water include Gunlock wells, Snow Canyon wells, and Quail Lake water treatment plant.  

2010 Water Quality Report

2009 Water Quality Report

2008 Water Quality Report

For more information about water quality, please visit the following websites:

Washington County Water Conservancy District

City of St. George

Page 1 of 2

  • «
  •  Start 
  •  Prev 
  •  1 
  •  2 
  •  Next 
  •  End 
  • »